Vietnam Na Duong Phase II 1×110 MW Coal-fired Power Unit Project
Located in Lang Son Province, Vietnam, the Nayang Phase II Power Plant Project is invested by Vietnam Coal and Power Corporation as a key power supply project in northern Vietnam, with a total installed capacity of 110MW and a total investment of approximately RMB 1.8 billion. Dier Group is responsible for core equipment installation and unit commissioning. Construction started in 2021, the main transformer was installed in December 2025, and special training for operation and maintenance personnel was launched in May 2026. The project is expected to be connected to the grid in the third quarter of 2026.
As a critical project to address Vietnam’s power shortage, it will generate 850 million kWh of electricity annually after operation, meeting the power demand of about 300,000 residents and enterprises in industrial parks in northern Vietnam. It effectively alleviates the production reduction caused by power shortages in local manufacturing since 2023, and is a representative project of China-Vietnam clean energy cooperation.