Skip image slider

Bangladesh Shahjibazar 100 MW Gas Turbine Project

Located in Hobiganj Upazila, Sylhet Division, northeastern Bangladesh, about 140 kilometers from the capital Dhaka, the Shajibazar 330MW Gas-Fired Combined Cycle Power Plant is a key project under Bangladesh’s “2016-2021 Five-Year Power Development Plan” and a key overseas power project supported by China’s “421 Special Fund”. The EPC contract is undertaken by a joint venture of China Energy Engineering Group Guangdong Power Engineering Co., Ltd. and Guangdong Electric Power Design Institute. Adopting a 2+1 multi-shaft combined cycle configuration, the project has a total installed capacity of 330MW with a total investment of approximately USD 280 million, financed by China’s export buyer’s credit.

Contact Form

Construction officially started in August 2014. Overcoming challenges such as long monsoon seasons, complex geological conditions, and difficult cross-border equipment transportation, the project successfully completed the 168-hour full-load trial operation and entered commercial operation on December 20, 2016. The unit has a thermal efficiency of 55.8% and NOx emissions below 50mg/Nm³, with all performance indicators reaching international advanced levels. As the largest gas-fired power plant in Bangladesh at that time, it generates approximately 2.2 billion kWh of electricity annually, meeting the power demand of about 1.8 million residents in Dhaka and surrounding areas, significantly alleviating the long-standing power shortage and improving the reliability of Bangladesh’s national grid by nearly 10%.

As a landmark achievement of China-Bangladesh energy cooperation, the project has driven the export of over RMB 350 million worth of Chinese-made equipment and materials, created more than 1,200 direct local jobs, and trained nearly 300 Bangladeshi power operation and maintenance technicians, laying a solid brand foundation for subsequent Chinese-funded enterprises to expand into the Bangladeshi power market. In March 2017, Bangladeshi Prime Minister Sheikh Hasina personally inaugurated the project, praising it as “a model of friendly cooperation between Bangladesh and China”.

Related Products

Related News

Scroll to Top

Get A Free Quote Now !

Contact Form
If you have any questions, please do not hesitate to contact us.
Jining China Power Machinery Co.,Ltd